Luyện tập tổng hợp

Bạn chưa đăng nhập. Vui lòng đăng nhập để hỏi bài
Ngô Thu Hường

The My Thuan bridge spanning the Tien (1) .............., a branch of the Mekong River, was opened to traffic (2) .............. May 21st, 2000. The cable-stayed, 1,535 meter-long bridge, (3) .............. connects the southern provinces of Tien Giang and Vinh Long, was (4) .............. in 34 months, eight and a half months shorter than scheduled. It is expected that with the (5) .............. to traffic of the My Thuan Bridge, the (6) .............. condition of farmers in Tien Giang province will be improve greatly (7) .............. the bridge provides faster, cheaper and better transports for people and goods both (8) .............. of the Tien River.

Các bạn học giỏi giúp mình với nhé

Linh Diệu
9 tháng 9 2017 lúc 16:49

The My Thuan bridge spanning the Tien (1) ..river............, a branch of the Mekong River, was opened to traffic (2) ......on........ May 21st, 2000. The cable-stayed, 1,535 meter-long bridge, (3) ..which............ connects the southern provinces of Tien Giang and Vinh Long, was (4) ..........completed.... in 34 months, eight and a half months shorter than scheduled. It is expected that with the (5) ............broadening.. to traffic of the My Thuan Bridge, the (6) .......transport....... condition of farmers in Tien Giang province will be improve greatly (7) ....because.......... the bridge provides faster, cheaper and better transports for people and goods both (8) .............. of the Tien River.

Ngô Thu Hường
9 tháng 9 2017 lúc 15:36

Linh Diệu Dương Yến Tử Đức Minh Phương An Linh Nguyễn Tử Đằng Nguyễn Thị Nguyệt Huy Thắng Nguyễn ,......

Tử Đằng
10 tháng 9 2017 lúc 11:50

The My Thuan bridge spanning the Tien (1) ......RIVER........, a branch of the Mekong River, was opened to traffic (2) ......ON........ May 21st, 2000. The cable-stayed, 1,535 meter-long bridge, (3) .......WHICH....... connects the southern provinces of Tien Giang and Vinh Long, was (4) .......COMPLETED....... in 34 months, eight and a half months shorter than scheduled. It is expected that with the (5) ......OPENING........ to traffic of the My Thuan Bridge, the (6) ......LIVING........ condition of farmers in Tien Giang province will be improve greatly (7) .......BECAUSE....... the bridge provides faster, cheaper and better transports for people and goods both (8) ......SIDE........ of the Tien River.


Các câu hỏi tương tự
Vu Huy Hoang
Xem chi tiết
Đây Là Tên
Xem chi tiết
Nguyễn Phan Thục Uyên
Xem chi tiết
Xích U Lan
Xem chi tiết
Trâm Trần Thị Ngọc
Xem chi tiết
Julian Edward
Xem chi tiết
Julian Edward
Xem chi tiết
Julian Edward
Xem chi tiết
Nguyễn Thị Thu Hằng
Xem chi tiết